Residential development to a terraced dwelling
Site inspection showing the progress of carpentry work.
This site involves extension works at every level:
- A new basement
- A 6m ground floor extension
- A loft conversion
- Complete refurbishment on all floor levels
The contractor has cleared the site, installed beams at first and second floor levels, built a new roof and built the new roof dormer.
We are currently preparing the site for the basement works, and addressing the drainage design with the contractor. The basement waterproofing system involves the walls and floor to be lined with a newton tanking system, this will be accompanied with 2 pumps that serve ground water and sewage independently.
First floor has been stripped back to stud work to prepare for refurbishment