Clifton Gardens, Oakwood Development Project

Large residential development in Oakwood

Site inspection showing the progress of the brickwork and steel installation for the ground floor extension.

This development has progress a long way in a short period of time. The site has had to have piled foundations due to the proximity of trees affecting the stability of the soil. Since piling the contractor within 1 month has built brickwork up to first floor level and is now demolishing part of the house to prepare for the next stage, involving a first floor extension and loft conversion.

  • Site Visit 2
    • Clifton Gardens building work in progressStreet view of site. Works to the two storey side extension have commenced with brickwork now taken to the first floor level. Site hoarding has been put in place with all health and safety signage to comply with CDM regulations/

      Clifton Gardens Building work Looking through the new front door. The original flank wall to the dwelling has been removed and entrance lobby enlarged. New matching brickwork has been toothed into the existing facing brickwork. Existing bay windows have been stripped back and will be re-built in a manner that promotes energy efficiency.

      Clifton Gardens work in progressRear view of dwelling, brickwork to the first floor extension has commenced. The hipped roof to the ground floor rear extension has been formed with all steel work in place.

      Constructions works at Clifton Gardens property LondonClose-up of the open corner to the ground floor rear extension, showing the cantilevered beam that will form a frameless glazed corner.

      Clifton Gardens building work in progressLooking across the opening for the rear doors and glazed corner.

      Clifton Gardens Building work Looking our from the new living room, the roof to the rear extension follows the pitch roof line thanks to the design and installation of a cranked beam. Flooring has been built up in beam and blockwork.

      Clifton Gardens work in progressLooking along the cranked beam and cantilevered beam to create the structural opening over the frameless glazed corner.

      Constructions works at Clifton Gardens property LondonStrip out at first floor level, in preparation to received the new floor, staircase and roof connection.

      Constructions works at Clifton Gardens property LondonLooking across the new first floor landing where the original dwelling meets the extended part.

      Constructions works at Clifton Gardens property LondonFormation of new front bay window.

      Constructions works at Clifton Gardens property LondonStructural openings for new rooflights to the rear ground floor extension.

  • Site Visit 1
    • Clifton Gardens building work in progressRear extension brickwork has been built up, ready for the Steelwork installation

      Clifton Gardens Building work Steelwork installation underway

      Clifton Gardens work in progressHallway has been gutted for refurbishment works

      Constructions works at Clifton Gardens property LondonFront extension brickwork has been built up, ready for Steel Work installation

Click Here to see more of our London Projects