Our Process

Successful schemes are the result of good preparation and planning. Our services are tailored to your project specific needs but our process remains the same regardless of size or type.

book a consultation

Our Architectural Design & Planning Process

We help homeowners, developers and investors in Barnet, Enfield & North London navigate every step, from first enquiry through to planning approval and project completion, with clarity, creativity and confidence.

Why Our Process Matters

Before you draw a line or cut a brick, it’s critical to set a foundation: one that respects planning constraints, ensures buildability and protects your budget.

Our process keeps things transparent, compliant and tailored so you avoid surprises, delays or overspend.

Our work stages

We adopt a structured, staged approach across all projects, from development of the initial project brief through to completion and post-handover support. Our services are organised into six professional stages,

Stage 1

Preparation of project

Stage 2

Concept design

Stage 3

Developed design & planning

Stage 4

Technical design / BIM

Stage 5

Tender, management & construction

Stage 6

Handover / use

Stage 1 - Preparation of project            

This is where the journey begins.

Before commencing any design works, we will meet to identify and develop your initial brief considering development aspirations and matters that can influence them. Feasibility studies are carried out by MSK Design addressing site massing, physical limitation/conditions of the site, planning considerations and statutory requirements.

MSK Design works in a detailed and methodical manner at this stage to ensure that a clear and concise brief is prepared at this early stage to encompass all client aspirations.

RIBA STAGE 0-1

Preparation of project brief considering:

  • Project outcomes:

    • Sustainability outcomes

    • Quality aspirations

    • Spatial requirements

    • Potential planning routes and options to achieve compliance (where possible at this stage)

  • Preparation of appointment documents

  • Undertake Feasibility studies

  • Agree a Project Budget

  • Obtain site information (surveys/reports)

  • Prepare a project programme/timeline

Stage 2 - Concept design

Following the completion of the Concept stage, we will look at the development holistically to obtain a greater understanding of the principle of the development against the project brief parameters.

We will meet with you to present our findings and recommendations, during these meetings we will also develop concepts in response to questions as this is a stage of exploration. Quite often at this stage, we may present options suited to your development that you may not have considered. This stage will offer you the early opportunity to consider how to develop your development requirements/project brief.

RIBA STAGE 2

  • Preparation of concept schemes (in 2D and 3D) aligned with client brief

  • Exploration of development options reviewed against client brief

  • Review of cost plan

  • Review of potential engineering requirements

  • Update client brief where required

  • Appointment of specialist consultants (known at this stage)

Stage 3 - Developed design & planning

Here, we delve deeper into our schemes to bring our proposals closer to becoming a ‘buildable’ scheme.

Proposals become more detailed and coordinated to allow us to integrate engineering principles and associated statutory or project specific considerations (energy efficiency, daylighting, acoustics to name a few) to enable our scheme to align with the architectural concept and address the project brief.

At this stage, we will engage with consultants and take on their responses, present our findings to our clients and review comments, address planning pre-app (dependent on projects), negotiate policy compliance and factor-in responses.

RIBA STAGES 2-3

  • Initial review of Building Regulation requirements (limited/where possible)

  • Engineering review (limited/where possible)

  • Review design changes and cost plan, update client brief where required

  • Confirmation of final design and planning route

  • Preparation of planning application documents

  • Submission of planning application/s and monitoring

Stage 4 - Technical design/BIM

Following planning approval (or in some cases, confirmation of consent), our scheme is developed further on a technical level to prepare detailed proposals for construction fully integrating the required engineering works (structural, mechanical, acoustic etc) and other project specific requirements to make our scheme constructable.

Planning conditions are reviewed and addressed at this stage.

Technical consultants are brought in at this stage to address post planning matters and our technical packages.

RIBA STAGE 3-4

  • Discharge planning conditions

  • Address statutory applications (Utilities, Building Control etc)

  • Preparation of performance specifications for M&E installations

  • Preparation of initial fit-out specifications/aspirations

  • Appointment, coordination and management of specialist consultants, integration of responses received to final design/technical packages.

  • Identification of construction contract route

  • Preparation of technical design packages for tender/construction

Stage 5 - Tender, contract management and construction

We address this as a hybrid of work stages 4-5 broken down into three parts (in summary):

  1. The lead-into the appointment of the contractor, addressing pre-commencement statutory obligations, identification of suitable contractors, tender management, preparation of contracts and signing of contracts.

  2. Commencement of construction works, on site monitoring, on site queries, and management of contracts.

  3. Resolve pre-occupation matters addressing snagging, remedial works, pre-completion testing and commissioning and achieve Practical Completion under the building contract. Any remaining post occupancy planning conditions are resolved at this stage.

RIBA STAGES 4-5

  • Preparation of Construction Phase Plan

  • Identify/address party wall obligations

  • Identification of suitable contractors and specialist installers

  • Contractor/specialist installer review

  • Preparation of construction contract

  • Appointment of main contractor

  • Monitoring of works, on-site inspections

  • Address on site requests for information and queries

  • Carry out contract administrator duties, address variations, carry out valuations and award payment certificates

  • Address pre-completion commissioning and testing for regulatory compliance and activation of warranties.

  • Address on site snagging and defect in preparation of handover.

  • Issue Practical Completion certificate under contract

Stage 6 - Handover / Use

At this stage under a fully managed service, the development is handed over to the client and we enter a period of aftercare. We maintain contact with our clients after occupation to address any questions, review performance and assist in coordinating remedial works arising during the defects liability period.

At the expiry of defects liability period (term documented under the building contract), any required remedial work is coordinated with the contractor prior to issuing the Final Certificate under the building contract.

RIBA STAGE 6-7

  • Hand over building in line with ‘Plan for Use’

  • Coordinate seasonal commissioning and maintenance in line with contract

  • Monitor, document and coordinate defects rectification

  • Post occupancy review

  • Implement management and maintenance plan

  • Undertake a post occupancy evaluation of the building performance in use

  • Verify project outcomes